An effective graph-analysis method to schedule a continuous galvanizing line with campaigning boundary constraints
Autor(es) y otros:
Fecha de publicación:
2024
Versión del editor:
Citación:
Computers and Industrial Engineering, 192, (2024); doi:10.1016/j.cie.2024.110206
ISSN:
Patrocinado por:
This work was supported by the ERASMUS + Program via the project Academic System Resource Planning: A Fully-Automated Smart Campus (ASRP) [grant number UE-19-ASRP-598757].
Colecciones
- Artículos [36307]