Sequencing jobs with asymmetric costs and transition constraints in a finishing line: a real case study
Publication date:
2022
Publisher version:
Citación:
Computers and Industrial Engineering, 165 (2022); doi:10.1016/j.cie.2021.107908
ISSN:
Local Notes:
OA ATUO21
Patrocinado por:
This article was financially supported by the Spanish State Research Agency of the Spanish Ministry of Science and Innovation (MCIN/AEI/ 10.13039/501100011033), via the project ‘SPeeding Up the transition towards Resilient circular economy networks: forecasting, inventory and production control, reverse logistics and supply chain dynamics’ (SPUR, grant ref. PID2020-117021 GB-I00).
Id. Proyecto:
MCIN/AEI/PID2020-117021 GB-I00
Collections
- Administración de Empresas [386]
- Artículos [31573]
- Investigaciones y Documentos OpenAIRE [5910]
Files in this item
