Sequencing jobs with asymmetric costs and transition constraints in a finishing line: a real case study
Autor(es) y otros:
Fecha de publicación:
2022
Versión del editor:
Citación:
Computers and Industrial Engineering, 165 (2022); doi:10.1016/j.cie.2021.107908
ISSN:
Notas Locales:
OA ATUO21
Patrocinado por:
This article was financially supported by the Spanish State Research Agency of the Spanish Ministry of Science and Innovation (MCIN/AEI/ 10.13039/501100011033), via the project ‘SPeeding Up the transition towards Resilient circular economy networks: forecasting, inventory and production control, reverse logistics and supply chain dynamics’ (SPUR, grant ref. PID2020-117021 GB-I00).
Colecciones
- Administración de Empresas [504]
- Artículos [36923]
- Investigaciones y Documentos OpenAIRE [8183]
Ficheros en el ítem
