Show simple item record

 Hosting capacity in power systems considering seasonal and hourly capacity ratings for the transmission lines, under sufficiency criterion

dc.contributor.advisorOliveira Nóbrega, Rui José
dc.contributor.advisorAgreira, Cristina Faustino
dc.contributor.authorPérez Martínez, Jorge Andrés
dc.date.accessioned2024-10-08T10:17:12Z
dc.date.available2024-10-08T10:17:12Z
dc.date.issued2024-07-05
dc.identifier.urihttps://hdl.handle.net/10651/74849
dc.description.abstractWhen considering the operation of transmission networks in the medium and long term, it is necessary to determine the amount of additional power that each node of the network can allocate. This aspect is intrinsically related to the transport capacity of the transmission lines in the network, which consequently requires more precise estimates of this transport capacity for medium and long term operational and planning studies. This work proposes the use of more accurate estimates, without reaching real-time estimates, of the transmission capacity. The objective is to determine the amount of additional power that a transmission network node can accommodate without requiring additional investment in transmission infrastructure. This capacity is determined using a representative sample of system operating conditions, followed by a steady-state contingency analysis to quantify the expected amount of network congestion caused by the addition of a new generation facility. The main result of the design and implementation of the methodology is the value of additional power that each node in the grid can accommodate, comparing the impact of using three different transmission capacity estimates, Static Line Rating (SLR), Seasonal Adjustment Rating (SAR), and Ambient Adjustment Rating (AAR).
dc.format.extent86 p.
dc.language.isoengspa
dc.relation.ispartofseriesMáster Universitario Erasmus Mundus en Transporte Sostenible y Sistemas Eléctricos de Potencia
dc.rightsAttribution-NonCommercial-NoDerivatives 4.0 Internacional
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/4.0/
dc.title Hosting capacity in power systems considering seasonal and hourly capacity ratings for the transmission lines, under sufficiency criterionspa
dc.typemaster thesisspa
dc.rights.accessRightsopen access


Files in this item

untranslated

This item appears in the following Collection(s)

Show simple item record

Attribution-NonCommercial-NoDerivatives 4.0 Internacional
This item is protected with a Creative Commons License